How it works

Eight steps, in order. Each one produces a document. The whole sequence from requirement sheet to shipment typically runs 8–14 weeks, dominated by sample rounds and production, not by sourcing.

Project timeline in weeks Requirement sheet at week zero; shortlist weeks one to two; samples weeks two to five; audit weeks three to six; contract weeks five to six; production weeks six to ten; inspection weeks ten to eleven; shipment weeks eleven to fourteen. Eight steps, 14 weeks. Sampling and production consume two thirds of it. Requirement sheet Shortlist Samples Audit Contract and terms Production Inspection Shipment 0 2 4 6 8 10 12 14 Orange is where your money is committed and your calendar is exposed.
  1. Requirement sheet — week 0 Product, target landed cost, quantity, destination market, certification required. I send the sheet; you fill it. If it comes back vague, I return it rather than interpret it, because an interpreted brief is how wrong factories get picked. Cost: none
  2. Shortlist — week 1–2 3–5 factories that actually make the product, compared on quote, monthly capacity, certificates, and export record. Trading companies posing as factories get filtered here, before they reach your inbox. Cost: covered by the project fee
  3. Samples — week 2–5 You pay the factory for samples directly. I coordinate specification and comparison. Sample approval means the sample met the spec — it does not mean the bulk run will, and the report says so in those words. Cost: sample and courier charges, paid to the factory
  4. Audit — week 3–6 On site, one full day. Live video walkthrough of the workshop, dated photographs, 32 checkpoints, written findings including what could not be verified. Cost: $399 per visit
  5. Contract and terms — week 5–6 30/70 or letter of credit. I review the terms for the things that actually cause disputes: tolerance on quantity, AQL acceptance level, late-delivery remedy, and who owns the mould. Money never passes through my account. Cost: covered by the 5% commission, on orders above $10,000
  6. Production follow-up — week 6–10 One fixed update per week with current photographs from the line. Not daily messages, not silence followed by an apology. Cost: covered by the 5% commission, on orders above $10,000
  7. Inspection — week 10–11 Pre-shipment inspection to AQL 2.5 on a first order, always. Defect photographs, a count against the acceptance number, and a pass or hold recommendation. Cost: $199 per inspection
  8. Shipment — week 11–14 Booking, consolidation, export documentation. Handed to your forwarder, or to mine if you do not have one. Freight passed through at the carrier invoice. Cost: flat consolidation fee + freight at cost

Where the time actually goes

Not in finding factories. Supplier discovery takes one to three weeks. Sampling takes another three to four, and it is the step buyers most often compress and most often regret compressing — a specification problem found at sample stage costs a courier fee, the same problem found at pre-shipment costs a rework cycle.

What you keep if you stop

Every document produced — shortlist, audit report, photographs, inspection report — is yours. If you decide to continue with the factory directly after the audit, that is a legitimate outcome and I will not withhold the report. The commission only applies to orders I manage.

Start at step one